blog

How to Check Your Business Is Ready for the PSTN Switch-Off

Written by Russell Stevenson | Nov 23, 2026, 9:44:09 AM

Getting ready for the PSTN switch-off starts with knowing what you've got. If that information sits across bills, spreadsheets, suppliers and different teams, pulling it together is the first job.

 

This checklist will help you turn a general intention to migrate into a plan someone can manage. If work is already under way, use it to find anything missing.

 

 

1. Build a List You Can Work From

List the remaining phone lines and related services at each site. For each one, record its number or service reference, provider, purpose and the person responsible.

 

Recent bills are a useful starting point, but match them to what is actually in use. Ask local site contacts about connections managed outside the main IT contract. Mark anything you can't identify as an open question with someone responsible for investigating it.

 

2. Get the Right Supplier to Confirm Equipment Requirements

If equipment uses a phone line, ask its supplier whether that connection is affected and what alternative it supports. This could include alarm systems, lift phones, entry systems or payment equipment, depending on how they're connected.

 

Ask for a specific answer for the equipment and configuration you have. Will it work with the proposed service? Does anything need replacing? Who will make the changes and test the result?

 

For safety-related equipment, agree the change with the relevant specialist before altering the line. Don't assume that an adaptor or a successful test call proves the whole system will work as required.

 

3. Check What the New Service Needs From Your Network

For calls carried over the internet, look beyond the headline broadband speed. Discuss expected call volumes, competing traffic, coverage where people will make calls and the condition of routers, switches and other equipment.

 

Where the answer isn't clear, a TIEVA network assessment can examine the relevant environment and recommend improvements. Agree its scope around your concerns; it should complement the line and equipment checks, rather than be treated as proof that every PSTN dependency has been found.

 

If several sites need better traffic management and consistent security, secure SD-WAN may be worth considering. But it isn't a prerequisite for every migration.

 

4. Choose the Replacement Around the Job It Has to Do

A business replacing a traditional phone service may have several options. The right choice depends on its existing system, compatibility, how people work and what it wants to retain.

 

TIEVA's communications services include cloud calling and SIP trunking. Connectivity options include business broadband and leased lines. Hardware may also need reviewing as part of the design.

 

Ask the provider to explain which existing equipment can stay, what needs changing and why. The PSTN retirement does not mean every copper connection disappears or that full fibre is the only possible replacement.

 

5. Agree the Work, Including Interruptions

Put responsibilities and dependencies into the plan. Who orders the connection? Who coordinates number transfers? When will equipment suppliers be available? What needs to happen before the old service can be retired?

 

Discuss power and connectivity failures too. Work out which calls and connected services must remain available, then agree suitable backup arrangements with the relevant providers.

 

Confirm achievable dates rather than working backwards from the deadline and assuming everything will fit. If something cannot be completed in time, ask the provider what options are available for that specific service.

 

6. Test Before You Sign Off

Agree the acceptance checks in advance. These may include incoming and outgoing calls, number routing and supplier-led tests of connected equipment. Record the results and who has accepted them.

 

Only cancel an old service once its purpose has been understood and the responsible people have confirmed it's safe to do so.

 

Need help coordinating the work? TIEVA offers PSTN migration support aligned with our Advise, Design, Integrate, Manage and Optimise approach. We can discuss the help you need, from understanding the starting point to agreeing the changes and support required afterwards.

 

Discuss your PSTN migration with TIEVA.